Logo
Adam T's Collection
 
4/18/2024
 
 
 
 
 
Owner: Providence and Worcester
Model:GE B39-8EBuilt As:LMX 8504 (B39-8E)
Serial Number:45413Order No:1410LMX
Frame Number:Built:10/1987
Notes:Built 10-87 Ex - LMX 8504
Other locos with this serial:  LMX 8504(B39-8E) PW 3907(B39-8E)
  Page Controls   View:  Pics Per Page:
PW 3907
Title:  PW 3907
Description:  PW 3907 leads train CT-1 northbound across the Middletown Diamond. The train will switch the Mattabassett Water Treatment plant in Cromwell before returing to the Cedar Hill Yard in New Haven. That coil car is an empty from Primary Steel.
Photo Date:  2/17/2006  Upload Date: 3/14/2008 7:55:02 PM
Location:  Middletown, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  602   Comments: 0
Train CT-1X
Title:  Train CT-1X
Description:  PW train CT-1X prepares to head north to Hartford to interchange with Connecticut Southern train CSO-3.
Photo Date:  4/13/2006  Upload Date: 11/4/2006 1:29:40 PM
Location:  Middletown, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  616   Comments: 0
Train CT-1X
Title:  Train CT-1X
Description:  PW 3907 and PW 3901 arrive at the CSOR interchange with train CT-1X at Hartford.
Photo Date:  4/13/2006  Upload Date: 11/10/2007 2:42:35 PM
Location:  Hartford, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E) PW 3901(B39-8E)
Views:  733   Comments: 0
PW 3907
Title:  PW 3907
Description:  CT-1X works the PW/Connecticut Southern interchange in Hartford as a few of CSO-3's cars look on in the background.
Photo Date:  4/13/2006  Upload Date: 12/17/2006 7:55:09 PM
Location:  Hartford, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E) PW 3901(B39-8E)
Views:  786   Comments: 0
PW 3907 and PW 5001
Title:  PW 3907 and PW 5001
Description:  PW 5001 looks on as PW 3907 switches the Middletown Sewer Department.
Photo Date:  4/24/2006  Upload Date: 7/23/2007 4:59:27 PM
Location:  Middletown, CT
Author:  Kathy Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  802   Comments: 0
PW 3907
Title:  PW 3907
Description:  PW 3907, one of the units on today's CT-1X, had a small fire and had to be left in Middletown to be picked up by train CT-1.
Photo Date:  6/19/2006  Upload Date: 11/16/2006 3:23:38 PM
Location:  Middletown, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  483   Comments: 0
PW 3907
Title:  PW 3907
Description:  PW 3907 is the trailing unit on train CT-1 as the train crosses West Street in Middlefield. The train will switch Tilcon in Wallingford, and then run to the Cedar Hill Yard in New Haven.
Photo Date:  7/7/2006  Upload Date: 12/27/2008 5:40:23 PM
Location:  Middlefield, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  341   Comments: 0
PW 3907
Title:  PW 3907
Description:  PW 3907, the rear unit on train CT-1, passes the Country Depot Antiques building, as the train heads north for Middletown and Portland.
Photo Date:  7/17/2006  Upload Date: 12/1/2007 4:41:35 PM
Location:  Middlefield, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  328   Comments: 0
PW 3907
Title:  PW 3907
Description:  PW 3907 leads train CT-1 past Country Depot Antiques and across West Street. The train will switch Tilcon in Wallingford and then run to the Cedar Hill Yard.
Photo Date:  7/20/2006  Upload Date: 12/28/2008 11:42:55 AM
Location:  Middlefield, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  318   Comments: 0
PW 3907
Title:  PW 3907
Description:  PW 3907 was the rear unit on northbound train CT-1. It is now going to switch the Mattabassett Water Treatment plant, while the rest of the train (the end of which can be seen to the right of 3907) goes across the Connecticut River to switch Smurfit-Stone Container and Murphy Road Recycling.
Photo Date:  7/26/2006  Upload Date: 11/16/2006 3:11:05 PM
Location:  Middletown, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  459   Comments: 0
PW 3907
Title:  PW 3907
Description:  CT-1's crew has just split in two---at this point, 3907 will remain in Middletown for refueling while the rest of the train crosses the diamond and heads for the Portland side of the Connecticut River.
Photo Date:  7/26/2006  Upload Date: 11/16/2006 3:17:21 PM
Location:  Middletown, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E) PW 3008(B30-7AB)
Views:  717   Comments: 1
PW 3907
Title:  PW 3907
Description:  PW 3907 leads southbound train CT-1 past the small antique store, on the way to the Tilcon quarry in Wallingford, then the Cedar Hill yard in North Haven. The siding farthest off to the right is the Dyno siding, where CT-1 will be making a pick up, before proceeding to Tilcon and Cedar Hill.
Photo Date:  8/24/2006  Upload Date: 11/3/2006 3:51:21 PM
Location:  Middlefield, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  330   Comments: 0
PW 3907
Title:  PW 3907
Description:  PW 3907 leads train CT-1X southbound toward the Cedar Hill Yard after picking up loaded stone hoppers from the Tilcon quarry.
Photo Date:  10/14/2006  Upload Date: 12/15/2007 3:09:52 PM
Location:  Wallingford, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  385   Comments: 0
Train CT-1X
Title:  Train CT-1X
Description:  PW 3907 leads train CT-1X southbound with thirty five loads of stone just after departing the Tilcon quarry. In New Haven, the train will be handed over to the crew of CT-2X, which will take it to Danbury.
Photo Date:  10/14/2006  Upload Date: 11/9/2006 3:25:04 PM
Location:  Wallingford, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  372   Comments: 0
PW 3907
Title:  PW 3907
Description:  PW 3907 leads train CT-1 southbound across West Street.
Photo Date:  10/17/2006  Upload Date: 7/13/2009 2:21:07 PM
Location:  Middlefield, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  264   Comments: 0
PW 3907
Title:  PW 3907
Description:  PW 3907 leads train CT-1 southbound toward the Tilcon quarry and then the Cedar Hill yard.
Photo Date:  10/17/2006  Upload Date: 11/26/2006 8:46:20 PM
Location:  Middlefield, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  332   Comments: 0
PW 3907
Title:  PW 3907
Description:  PW 3907 is the trailing unit on train CT-1, as the train crosses West Street in Middlefield.
Photo Date:  10/23/2006  Upload Date: 8/5/2008 1:05:25 PM
Location:  Middlefield, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  198   Comments: 0
PW 3907
Title:  PW 3907
Description:  PW 3907 leads a southbound CT-1 toward the Tilcon quarry to pick up loads of stone and then the Cedar Hill yard in New Haven.
Photo Date:  11/14/2006  Upload Date: 11/15/2006 7:00:37 PM
Location:  Middlefield, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  247   Comments: 0
Train CT-1
Title:  Train CT-1
Description:  PW 3908 leads train CT-1 into Middletown with a load for Primary Steel and a load for Smurfit-Stone Container in tow.
Photo Date:  12/28/2006  Upload Date: 7/26/2009 12:57:42 PM
Location:  Middletown, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  185   Comments: 0
PW 3907
Title:  PW 3907
Description:  PW 3907 emerges from the fog, leading train NH-1 into the Old Saybrook Station. The crew will now await the arrival of NR-2 from Plainfield to perform interchange duties.
Photo Date:  1/15/2007  Upload Date: 1/15/2007 4:45:53 PM
Location:  Old Saybrook, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  368   Comments: 0
PW 3907
Title:  PW 3907
Description:  PW 3907 leads southbound train CT-1 across West Street.
Photo Date:  2/6/2007  Upload Date: 9/13/2007 7:41:39 PM
Location:  Middlefield, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  189   Comments: 0
PW 3907
Title:  PW 3907
Description:  Under mostly cloudy skies, PW 3907 leads a one car CT-1 southbound across West Street. To the right of PW 3907 is the old Middlefield Freight Station, now Country Depot Antiques.
Photo Date:  2/13/2007  Upload Date: 5/25/2007 1:10:20 PM
Location:  Middlefield, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  219   Comments: 0
PW 3907
Title:  PW 3907
Description:  PW 3907 is the middle unit on train CT-1, as the train heads northbound for Middletown.
Photo Date:  2/22/2007  Upload Date: 12/16/2007 2:30:50 PM
Location:  Middlefield, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  194   Comments: 0
Meet at Unilver
Title:  Meet at Unilver
Description:  A northbound Acela Express races northbound through Clinton as NH-1 exchanges a load for an empty at Unilver.
Photo Date:  2/23/2007  Upload Date: 9/14/2007 4:18:00 PM
Location:  Clinton, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E) AMTK 2005(Acela Power Car)
Views:  506   Comments: 0
Train NH-1
Title:  Train NH-1
Description:  PW 3909 looks on as PW 3903 and PW 3907 switch Unilever.
Photo Date:  2/23/2007  Upload Date: 9/14/2007 4:28:14 PM
Location:  Clinton, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3903(B39-8E) PW 3907(B39-8E) PW 3909(B39-8E)
Views:  440   Comments: 0
PW 3907
Title:  PW 3907
Description:  PW 3907 leads PW 3008 and PW 4001 toward the southern end of the Plainfield yard to get MFS-1's train ready to go to Willimantic.
Photo Date:  4/20/2007  Upload Date: 4/21/2007 6:14:44 PM
Location:  Plainfield, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  217   Comments: 0
PW 3907
Title:  PW 3907
Description:  After making up its train, PW 3907 will be the lead locomotive of MFS-1 when the train leaves for Willimantic.
Photo Date:  4/20/2007  Upload Date: 4/21/2007 7:59:38 PM
Location:  Plainfield, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  199   Comments: 0
PW 3907
Title:  PW 3907
Description:  Train MFS-1 prepares to depart the Plainfield Yard with four cars for the New England Central Railroad at Willimantic.
Photo Date:  4/20/2007  Upload Date: 4/21/2007 8:04:01 PM
Location:  Plainfield, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  238   Comments: 0
PW 3907
Title:  PW 3907
Description:  PW 3907 begins its journey down the Willimantic Branch, leading train MFS-1. The train is on its way to Willimantic.
Photo Date:  4/21/2007  Upload Date: 4/21/2007 8:14:30 PM
Location:  Plainfield, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  216   Comments: 0
PW 3907
Title:  PW 3907
Description:  PW 3907 leads train MFS-1 past Packers Pond, which is out of the photo to the right, on the way to Willimantic.
Photo Date:  4/21/2007  Upload Date: 4/24/2007 8:49:54 PM
Location:  Plainfield, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  201   Comments: 0
PW 3907
Title:  PW 3907
Description:  PW 3907 leads train MFS-1 past Packers Pond, on the way to Willimantic. Off to the right, Tom Nanos also photographs the train.
Photo Date:  4/21/2007  Upload Date: 4/24/2007 8:56:46 PM
Location:  Plainfield, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  219   Comments: 0
PW 3907
Title:  PW 3907
Description:  PW 3907 leads train MFS-1 past Packers Pond (out of the photo to the right) on the way to Willimantic.
Photo Date:  4/21/2007  Upload Date: 4/24/2007 9:00:36 PM
Location:  Plainfield, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  193   Comments: 0
PW 3907 and PW 3008
Title:  PW 3907 and PW 3008
Description:  PW 3907 and PW 3008 lead train MFS-1 past the Scotland Dam.
Photo Date:  4/21/2007  Upload Date: 10/5/2007 4:45:43 PM
Location:  Scotland, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E) PW 3008(B30-7AB)
Views:  423   Comments: 0
PW 3907
Title:  PW 3907
Description:  PW 3907 is the middle unit of a three unit, light engine CT-1, as the train heads southbound across West Street.
Photo Date:  5/30/2007  Upload Date: 5/30/2007 5:27:37 PM
Location:  Middlefield, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  170   Comments: 0
PW 3907
Title:  PW 3907
Description:  PW 3907 shoves a CSX box car into the Tilcon quarry. The train is picking up 45 loaded stone hoppers.
Photo Date:  7/24/2007  Upload Date: 7/24/2007 8:05:06 PM
Location:  Wallingford, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  165   Comments: 0
PW 3907
Title:  PW 3907
Description:  PW 3907 is the rear unit on train CT-1, as the southbound train crosses West Street.
Photo Date:  10/8/2007  Upload Date: 10/9/2007 6:37:50 PM
Location:  Middlefield, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  202   Comments: 0
PW 3907
Title:  PW 3907
Description:  PW 3907 leads PW 3904 on train CT-1 toward Main Street in the Rockfall section of Middlefield.
Photo Date:  12/13/2007  Upload Date: 12/14/2007 6:20:50 PM
Location:  Middletown, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  308   Comments: 0
PW 3907
Title:  PW 3907
Description:  PW 3907 leads PW 3904 on train CT-1 northbound across Forest Street in the Rockfall section of Middlefield, as a friendly wave comes from the engineer.
Photo Date:  12/13/2007  Upload Date: 12/14/2007 6:37:36 PM
Location:  Middlefield, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  275   Comments: 0
PW 3907
Title:  PW 3907
Description:  PW 3907 leads PW 3904 across Butternut Street on train CT-1 in the Rockfall Section of Middlefield.
Photo Date:  12/13/2007  Upload Date: 12/14/2007 6:43:20 PM
Location:  Middlefield, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  263   Comments: 0
PW 3907
Title:  PW 3907
Description:  PW 3907 leads PW 3904 on train CT-1 into Middletown, as a nearby church steeple looms in the background.
Photo Date:  12/13/2007  Upload Date: 12/14/2007 6:46:02 PM
Location:  Middletown, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  285   Comments: 0
It's Almost Here!
Title:  It's Almost Here!
Description:  A pair of Providence & Worcester's GE B39-8s hurries across the Middletown diamond on the way to a quick stop at Murphy Road Recycling. Within a few minutes, the entire area will be covered in snow as the year's first storm begins.
Photo Date:  12/13/2007  Upload Date: 12/14/2007 6:48:57 PM
Location:  Middletown, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E) PW 3904(B39-8E)
Views:  318   Comments: 0
PW 3907
Title:  PW 3907
Description:  PW 3907 picks up two loads from Murphy Road Recycling as the first flakes begin to fall in the season's first snow storm.
Photo Date:  12/13/2007  Upload Date: 12/15/2007 9:39:21 AM
Location:  Portland, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  450   Comments: 0
PW 3907
Title:  PW 3907
Description:  PW 3907, the northern unit on today's CT-1, gets ready to go up the Berlin Branch to switch Primary Steel and then do some switching in the Middletown yard.
Photo Date:  12/13/2007  Upload Date: 12/15/2007 9:56:17 AM
Location:  Middletown, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  290   Comments: 0
PW 3907
Title:  PW 3907
Description:  PW 3907 is now the trailing unit on train CT-1, as the train heads for Primary Steel on the Berlin Branch. After switching Primary Steel, the train will do some switching in the Middletown yard and then make a trip to Hartford.
Photo Date:  12/13/2007  Upload Date: 12/15/2007 10:13:35 AM
Location:  Middletown, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  319   Comments: 0
PW 3907
Title:  PW 3907
Description:  PW 3907 is the trailing unit on train CT-1 as the train crosses West Street on its way back to New Haven.
Photo Date:  12/13/2007  Upload Date: 12/15/2007 10:21:06 AM
Location:  Middlefield, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  144   Comments: 0
PW 3907
Title:  PW 3907
Description:  The crew is anxious to get home as CT-1 trudges across West Street on the way back to the Cedar Hill Yard.
Photo Date:  12/13/2007  Upload Date: 12/15/2007 10:23:16 AM
Location:  Middlefield, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E) PW 3904(B39-8E)
Views:  326   Comments: 0
CT-1 at Murphy Road Recycling
Title:  CT-1 at Murphy Road Recycling
Description:  PW 3907 uncouples from PW 3902 and PW 4002. That unit will now pull 7 loads from Murphy Road Recycling.
Photo Date:  12/27/2007  Upload Date: 12/29/2007 2:31:55 PM
Location:  Portland, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 4002(B40-8) PW 3902(B39-8E) PW 3907(B39-8E)
Views:  353   Comments: 0
PW 4002 and PW 3907
Title:  PW 4002 and PW 3907
Description:  PW 4002 looks on as PW 3907 switches Murphy Road Recycling.
Photo Date:  12/27/2007  Upload Date: 12/29/2007 2:39:38 PM
Location:  Portland, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 4002(B40-8) PW 3907(B39-8E)
Views:  296   Comments: 0
PW 3907
Title:  PW 3907
Description:  PW 3907 shoves 7 loads of demolition toward the Middletown yard. They will be dropped off there, and then the unit will go pull 3 empties from Primary Steel. After that, the 3 empties will be left in the yard, the 7 high-sided gondolas will be picked up (along with 4 others), and the train will go to Hartford.
Photo Date:  12/27/2007  Upload Date: 12/29/2007 2:51:34 PM
Location:  Middletown, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  290   Comments: 0
Train CT-1 on the Nook Hill Bridge
Title:  Train CT-1 on the Nook Hill Bridge
Description:  PW 3907, the trailing unit on train CT-1, crosses the Nook Hill Bridge. The train is on its way to interchange with CSOR in Hartford.
Photo Date:  12/27/2007  Upload Date: 12/29/2007 2:55:05 PM
Location:  Cromwell, CT
Author:  Adam Twombly
Categories: 
Locomotives:  PW 3907(B39-8E)
Views:  370   Comments: 0


Site Design ©2001-2020 Tim Huemmer
Photos © respective authors
  Contact: info@rrpicturearchives.net